31.03.2025 | Full-time | Siemens EnergyAnd secondary systems. Integration test and functional testing of HVDC control technology in our test center in Germany Execution and documentation of Functional Performance Tests (FPT) and Dynamic Performance Tests (DPT) of our C&P Hardware and Software including Customer Acceptance Tests Preparation
Uita-te mai târziu31.03.2025 | Full-time | Siemens EnergyPreparation of test documentation and revising - red marking of hardware drawings in close cooperation with our engineering department Technically flawless and on-time preparation of tests under consideration of the required test utilities, as well as evaluation and verification of test results with respect
Uita-te mai târziu21.03.2025 | Full-time | Siemens EnergyA Snapshot of Your Day In our HVDC Communication Team, we are implementing, testing and verifying the hardware and software for our innovative HVDC projects in our test facility and ensure a proper communication of our HVDC stations worldwide during commissioning. Our diverse and multinational teams
Uita-te mai târziu12.07.2024 | Full-time | Siemens EnergyAcceptance tests) at sub-suppliers Integration test and functional tests of HVDC control technology (C&P hardware and software) in our test center Support of the commissioning management in quality, risk and claim management Participation in improvement programs ( Lean, Reviews and Lessons Learned) What You
Uita-te mai târziu28.06.2024 | Full-time | Siemens EnergyIncluding the necessary verification ning, execution, and evaluation of workshop tests (acceptance tests) at sub-gration test and functional tests of HVDC control technology (C&P hardware and software) in our test ort of the commissioning management in quality
Uita-te mai târziuNu mai pierdeți niciun loc de muncă!
Abonare la toate joburile de Hardware Testing din România.